Gateway Logistics Network

Home / Knowledge Hub

Trade intelligence, written by operators

No think-pieces from people who have never seen a bill of lading. Practical guidance from members who move cargo for a living.

Container terminology

Equipment, handling and container movements

7 terms

FEU

Container

Forty-foot Equivalent Unit - two TEU. Often used when reporting cargo volumes rather than vessel capacity.

Example Annual volume of 4,000 FEU on the trade.

See also TEU

Flat Rack

Container

A container with no sides or roof, used for cargo too wide, long or heavy for a standard box.

Example Machinery loaded by crane, secured with lashings.

See also Open Top, Out of Gauge

Out of Gauge

Container

Cargo that exceeds the dimensions of the container carrying it, requiring special stowage and attracting surcharges.

Example A load overhanging a flat rack by half a metre each side.

See also Flat Rack, Breakbulk

Reefer

Container

A refrigerated container with its own machinery, used for temperature-controlled cargo. It needs power on the quay, on the vessel and on the truck.

Example Set point -18C for frozen seafood.

See also Cold Chain, Genset

Tare Weight

Container

The weight of the empty container itself, stencilled on the door. It is deducted from the gross to establish the payload actually carried.

Example A 40' HC at roughly 3,900 kg tare.

See also Payload, VGM

TEU

Container

Twenty-foot Equivalent Unit, the standard way of counting container volumes. A 20' box is one TEU, a 40' is two.

Example A vessel of 18,000 TEU capacity.

See also FEU, Slot

VGM

Container

Verified Gross Mass: the certified total weight of a packed container and its contents, which the shipper must declare before loading under SOLAS rules.

Example No VGM, no loading - the box stays on the quay.

See also Tare Weight, SOLAS

← All resources

Latest articles

Guides, case studies and market updates

Stacked shipping containers in a port yard
Ocean freight · 6 min read

Reading the 2026 ocean capacity cycle without the hype

What new tonnage deliveries actually mean for your contract negotiations this season.
12 August 2025
Port terminal operations viewed from above
Compliance · 8 min read

AEO, C-TPAT and the paperwork that actually speeds clearance

A practical comparison of the certifications your customers keep asking about.
4 August 2025
Cargo being loaded into the hold of a freighter aircraft at dusk
Air freight · 5 min read

Chargeable weight mistakes that quietly erode your margin

The five dimensioning errors we see most often on posted air requirements.
28 July 2025
Warehouse operative scanning inventory with a tablet
Case study · 7 min read

How a Dhaka forwarder built three European lanes in 18 months

Meridian Freight went from one agent relationship to eleven. Their director explains how.
19 July 2025
Interior of a modern high-bay distribution warehouse with racked pallets
Warehousing · 6 min read

Bonded, FTZ or plain storage, choosing without overpaying

The duty-deferral maths behind each option and the volume threshold that changes the answer.
11 July 2025
Line of freight trucks on a highway at sunset
Road and rail · 9 min read

Cross-border trucking: where the delays really come from

Border data from four corridors shows documentation, not distance, drives the variance.
2 July 2025
Browse by topic

Find what applies to your desk

Air freight

Chargeable weight, DGR, charters and cold chain.

Ocean freight

Capacity cycles, LCL economics, contract strategy.

Customs and compliance

AEO, classification, valuation and trade remedies.

Growing your network

Agent vetting, pricing discipline and conversion.

The monthly network briefing.

Trade-lane intelligence, member news and event dates. One email a month, no filler.
Scroll to Top